2/29/2024 0 Comments Desert breeze park concertOpenings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware, Mirrors.įinishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting. ![]() Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers. Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork. Masonry, Unit Masonry, Concrete Unit Masonry. The present project area consists of approximately 12.7 acres of development with approximately 5.5 acres of open natural turf, parking for 225 cars, a pre-fabricated box office, and a pre-engineered 12,000 SF production/warehouse building and construction of the south half of Kid Zone Parkway from Durango to the existing Desert Breeze Recreation Center.Ĭoncrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs. Scope: The site work consists of construction through undeveloped land through the means of clear and grub, rough grade, cut, over-excavation, haul, import fill, fine grade, dust control, and allowance for caliche removal. ![]() Sunset Airport Center II & III Tenant Improvements Shoshan Park Office / Warehouse Development
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |